Pages

Sunday, 16 August 2026

Joined-Up Thinking

Recently one of the followers on our Facebook page posted a comment asking if we'd ever considered connecting together our two Festiniog layouts Dduallt and Minffordd.


It's an interesting question, and the answer why we probably won't includes a number of hurdles we would have to overcome, so I thought it might make the basis of a decent blog piece.

I have to say it's a beguiling idea, and one I've often toyed with while daydreaming.

Long before we embarked on the Minffordd project I would often think wouldn't it be nice to have the space to set up Dduallt as a home layout, and instead of operating it end-to-end between fiddle yards - as we do at exhibitions - make it into a continuous run.

My daydream was always that we could have Dduallt on one side and Tan y Bwlch at the other, perhaps with an exit to a storage / fiddle yard as well, perhaps making use of the truncated route to the disused Moelwyn Tunnel behind the signal box.

That plan has never gone any further than a daydream, however.

So, now that we have two layouts, why not try to connect them now?

Here are the things you'd have to overcome.

HEIGHTS

As you would expect for model of Dduallt Spiral the layout is not flat!

Therefore the entry / exit points to the fiddle yards at each end of the run are at different levels.

Having never compared the measurements it’s also entirely possible that the height off the ground of the FR mainline on Minffordd is different yet again.

To connect them would inevitably involve some degree of ‘ski ramp’ at each end and the height that would have to be climbed by ascending trains would dictate how long these ramps have to be - which would have an impact on the viability of the idea.

CONTROL

As it stands the two layouts are using different systems.

Dduallt was built for plain old DC whereas Minffordd is all-singing DCC with sound.

It wouldn’t be impossible  to lash-up a way to make them work together on either control system, but, you couldn’t use both as once, nor would the stock be interchangeable.

And that’s an issue because Dduallt and its steep gradient was built assuming we would always use heavy white metal or brass locomotives with the traction to pull reasonable trains up the hill.

The latest ready to run locos - lovely as they are - really can’t cope with anything other than  flat layout with our stock.

ERAS

The other consideration - albeit the one that’s easiest to overlook - is that the layouts are set around 20 years apart.

Minffordd is depicted in the generic 1960s and Dduallt at the end of the 1980s with stock that’s anything up to the present day.

ORIENTATION 

The logical thing would be to have the layouts positioned back-to-back.

Unfortunately, that would see Up trains leaving Minffordd emerging on the Deviation on Dduallt as if they’d just left Tanygrisiau,  and the same in the opposite direction.

To be prototypical the connections would need a crossover at some point, making them much more complicated to build.

SPACE

Of course, the biggest obstacle is simply where we would ever find the room to put it all together to test and play with it.

Unless anyone wants to donate a large, secure, space somewhere on the west coast of Scotland to us? No, thought not…




Wednesday, 12 August 2026

Identical Twin

I've been neglecting the blog a little while I was away on holiday in Wales with Himself and The Trainee.

If you follow the Bron Hebog and Minffordd page on Facebook then you'll have been able to follow the narrow gauge adventures we were getting up to, with many photos and video snippets.

One of the missions to be accomplished during our stay in Porthmadog was the collection of a model from the shop at Harbour Station which I hinted about a few weeks ago on these pages.

Many of our readers guessed the intention with the Lowmac wagon is to replicate the arrival of Linda on the FR in 1962, on hire, to help with an acute motive power shortage.

A notable part of the story is that she made the journey by rail from Port Penrhyn, via Afon Wen, and was transhipped from standard to narrow gauge in Minffordd Yard exactly as Spooner would have intended.

There's a chance you're already one step ahead of me here and thinking; 'Hang on!  Haven't they already got a Linda?'

Yes, you're quite correct.

Linda in FR green with her 'fat England tender' is part of our core loco fleet for the mainline passenger services along the back of the scene.

So what's the excuse?

There's none.  

It's just a pure indulgence. 

And we're not apologising for it. 

A model railway is supposed to be fun!

There are some adaptations which need to be made before it goes into service (sort of).

Linda was propped up on the Lowmac with sleepers, and secured with chains, so we're doing our best to replicate that with some chunky styrene strips.


These have got some extra bits which will connect with the underside of the Bachmann loco to help ensure it doesn't topple off the wagon while being transported around the layout.

And we also need to find something for that most vital PQR embellishment - a bucket to sit in front of the smokebox!