Showing posts with label 130. Show all posts
Showing posts with label 130. Show all posts

Wednesday, 26 January 2022

Pick Your Battles

A number of unfortunate motorists in North Wales know from bitter experience over the last two and a half decades that if you pick a fight with a Garratt there's only going to be one winner.

Thus the many level crossings around the Beddgelert area are festooned with bilingual signage warning of the dangers of failing to stop and take a good look at whether there's 62 tonnes of articulated locomotive heading your way.

It's details like that which really lift a scene on a layout and, I hope, sometimes make you look twice to check if it really is a model.

Himself has finished this painstaking task by planting all the poles around Cemetery Crossing which is just to the south of Goat Tunnel.

Careful observation and a lot of detailed photographs on many research visits have paid dividends.


Monday, 24 January 2022

Model Rail Scotland Debuts

Excitement is building ahead of us taking Bron Hebog to Model Rail Scotland in Glasgow in a month's time, which will be our first show in more than two years.

While I was thinking about that the other day it occurred to me that there must be a number of models we built in that time which have not been seen in public yet (aside from on this blog and our social media).

I stopped counting when I got to 15.

So I thought you might like a reminder of what's among the new stuff.

The steam engines include NGG/16 130, which is all new, and in the last two years Himself has got round to painting Lyn and Welsh Pony.


The diesel fleet has been bolstered by the recent arrival of our green Vale of Ffestiniog, and the duplicate of Conway Castle in the livery in which it served with distinction on WHR construction trains and as the Dinas shunter for many years.


Now, we also have the locomotive which replaced it, the big yellow Baguley number 9, and at the other end of the spectrum the former Boston Lodge gofer Harold.

New carriages include 2048 and the fourth of the opulent observation cars Gwyrfai, as well the much less salubrious Ashbury replica 21 and the Pickering brake for the WHHR excursions / incursions. 


If Rule One is enacted at any point over the three days at the SEC you might also be lucky to see some of our new tow-along amusements including a derelict Livingston Thompson on ambulance bogies, and a freshly un-plinthed Princess.



Both are completely out of era - being 1980s representations - and completely out of place on the Welsh Highland section, but you never know...

More prototypical is a deconstructed NGG/16 loaded onto DZ flat wagons for transfer between Boston Lodge and Dinas.

This little tableau is a consequence of us being offered the chance to buy the remains of a Backwoods kit which someone made such a Horlicks of building that the best thing to be done with it was recover any parts which could be used as spares and turn what was left into a conversion piece.


Tuesday, 21 December 2021

Review Of The Year - Part 1

And so we come to the end of another year of lockdown and exhibition-less modelling - for us at least.

It's ironic that the reason I began this blog nearly a million page views ago, was to have a way of showing off what we were doing while we were in the long process of building Bron Hebog, and while Dduallt was retired from shows.

Never could I have imagined we'd face such a sustained period where modelling, once again, became an almost exclusively private activity in your home, with no communal outlet.

It's one reason to be thankful for the opportunities the online world gives us.

Now, as I always do at the end of December, I'm going to take a look back - three months at a time - at some of the highlights of our modelling .

January

I'm afraid to say that there's been little progress since the start of the year on my prototype for the FR infrastructure well wagon,


Since this picture was taken I have found a way to cast the deck pieces in styrene, but it still doesn't have any couplings so has yet to be given any sort of test run.

Himself was busy adding the final pipe runs onto to the boiler unit of the Backwoods NG G16 kit for our model of the freshly restored 130.

And he was also well on the way to lining out a set of three 3mm Hawksworth carriage kits he'd been making as a favour to the Engineering Consultant - a man who was destined for higher things before the year was out!

February

This was the year my son reached an age where he was ready for his first OO layout, and I found my moulding and resin casting skills came in handy fixing a second hand Mainline wagon which had lost one of its sliding doors on one side.


Once the pipe runs were finished on the real locomotive, Himself wasted no time in getting our 130 painted, lined, and sent on a test run on Bron Hebog.

It really looked quite the part!

Another locomotive which was finished off - after many years - was our Mercian Welsh Pony, which looks absolutely stunning matched with the Victorian set.

March

Our James Spooner II project was in danger of running perilously far ahead of the real build as Himself had a play around with the etches to see how the half cab arrangement would work,

This is a model I hope we can expect more updates on in 2022.

Many years after our first model was stolen at an exhibition, Himself finished off his long-term project to make a replacement of the works shunter Harold. (aka, Shitty the Shunter)

At this time I was busy working on a commission for a scratch built model of Carnforth buffet car 114 in styrene.


To be continued...

Wednesday, 24 February 2021

One Three Oh!

Just a couple of weeks behind the real locomotive our 130 has been completed and is undergoing some running-in on the WHR main line!

Himself reassembled the locomotive after the varnish had set on the boiler unit and reunited it with the power bogies which were finished last year, before taking it for a spin on Bron Hebog.

Unfortunately he doesn't have a large enough garage to put up the whole layout - but we can get the long top end section from the Rhyd Ddu fiddle yard down through the S-bend into the station running.

The lounge is the only part of the house large enough to accommodate the entire layout, but I suspect that might be out of bounds.....

Monday, 22 February 2021

Almost There

The arrival of warmer weather has allowed Himself to venture into the garage / workshop and unleash the airbrush on a number of models which have been awaiting a protective coat of vanish.

Of most interest to readers of this blog, I'm sure, are our latest FR and WHR locomotives.

Welsh Pony has all its transfers applied now, although when this photo was taken was still awaiting the fitting of the nameplates.

130 has been refitted with a lot of the extra piping and the handrails are the last things to be fitted, along with its number plates on the cab.

Both are going to make stunning models when they are reassembled and tested, hopefully within the next few days.

Monday, 15 February 2021

Stripey Boiler

There's been rapid progress with the next stage of lining out the boiler unit of 130.

With great skill Himself has applied the very fine straw lines around the boiler bands and begun work on the cab sides.

There's still some touching up to do on the corners, you'll notice.

Already you can see the finished effect is going to be terrific.


Saturday, 13 February 2021

Black Lines

The real 130 steamed back into action this week and our miniature version is not far behind.


With the main plum colour and the large expanses of black painted Himself has worked through applying the edging transfers around the cab and on the boiler bands.

We use lines of waterslide transfers because you get a much sharper definition than you would ever manage with a brush.


They will get a protective coat of varnish before the trickiest job of applying the fine, straw lines begins.

Monday, 8 February 2021

Sir Handle

Every so often I am astounded by Himself's ingenuity.

A case in point is when I received an update on progress with painting the boiler unit of 130.

What I noticed first was not the finish but the rather clever - and also wonderfully simple - way he is managing to avoid touching the wet paintwork.

He's using the hole at the back of the footplate where the rear power unit is connected to fix on a makeshift handle.

There's been something extra added in the cab, where he decided to use some styrene rod, and tiny brass wheels, to represent the various gauges and controls.




Thursday, 4 February 2021

No More Hanging Around

Himself has decided he's not going to wait any longer for illusive evidence of the pipework on the 'engine side' of 130, so it's time to start painting it whether it's right or wrong.

There was one remaining piece of brass wire to be connected up on the side of the firebox, and we'll just have to hope that they haven't decided to route it anywhere radically different to on the other three WHR engines.

The completed boiler and cradle have been given a coat of primer as the first step.

Both power units and their tanks / bunkers have been painted and lined in the gorgeous maroon livery, so this is the last step for completing the locomotive.

This will be our fifth NGG16 in the fleet, but only four of them represent WHR machines, the doyen of the quintet being turned out in plain black with Alfred County Railway branding on the bunker.

Friday, 22 January 2021

Wee Pipes

The boiler unit of 130 is getting tantalisingly close to being ready to paint.

This week, aided by the flow of new photographs of progress at Dinas on the real locomotive, representations of the thin pipework on the 'engine' could be added in brass.

There's been so much added to the model which is over and above what comes with the Backwoods kit, and - naturally - each of the WHR machines is different.

All we need now are to see some pictures taken from the opposite side and Himself can get it finished.


Thursday, 14 January 2021

Missing Piece?

For quite a few months the boiler unit of our 130 has been hovering on the cusp if completion, with just the final pipework around the front of the cab and top of the firebox to finish off.

That's because we were waiting to see the exact position of the pipe runs on the real locomotive first.

This week some pictures emerged from Dinas, courtesy of the FR GM, Paul Lewin, that might allow Himself to get cutting, bending and soldering.

With the power bogies and their bodywork painted and lined it's just the middle bit of the Garratt still in brass.

Perhaps there might not be too much longer to wait to see ours completed.


Thursday, 31 December 2020

2020 Review - Part 4

October

The output of new models slowed towards the end of the year, especially at my end of the operation as I spent more time concentrating on meeting requests for resin wagon kits and parts.

By now I had completed the prototype for the MOD flat wagon kit.


Himself spent a week volunteering on the FR and getting a look up closed at the new lining design on Welsh Pony.

We had always intended to finish ours in the green livery that was predicted all through the restoration, but now it looks like the running-in livery will be staying for a few years so we decided to take the plunge and apply that to our model, seen here with the black lining transfers around the edge being applied.


Himself also got round to a job he'd been meaning to tackle for a number of years, and overhaul the Steve Coulson working dioramas in our custody.


November

Progress can be an illusion sometimes.


Himself began applying the orange lining around the edge of the panels on Welsh Pony.

It looked fine on the tender, but once it added to the tighter areas like the cab sides it became painfully apparent that even the thinnest products from the Fox range would be unsuitable.

It was time for Plan B....

The delivery of the painted and lined cylinder covers for 130 to Dinas meant we could follow suit with confidence on ours.


There was more pipework added to the boiler unit which is the last part of the locomotive still under construction.


We can't complete it until we see pictures confirming the positions of all the pipes at the front of the cab.

December

Plan B for Welsh Pony meant stripping it right back to brass and starting again with a coat of primer and purple/plum from the airbrush.


We commissioned a set of bespoke transfers from Custom Model Decals and you can already see the results in some of the latest blog posts. 

I was kept busy with casting.

One customer asked if it was possible to produce some copies of the fake bogie frames we used on our Funkey diesels to disguise the N Gauge chassis.


An enquiry from one modeller turned into orders for 10 sets from all across the country, so that kept me busy for a few weeks.

Currently I am in the process of producing a prototype for a kit of the FR/WHR well wagon.


There's been good progress on the main body of the wagon.  

I'm hoping to finish it off with an etched brass deck covering but that may take a while to come to fruition.

That's the story of our 2020.

It was a year when it seems that railway modelling was given a shot in the arm by lockdown - within our homes at least - let's hope that in 2021 it might be possible to attend an exhibition again.

Wouldn't that be marvellous!

Sunday, 27 December 2020

2020 Review - Part 3

July 
 
As we moved into the second half of the year Livingston Thompson had been painted, lined and weathered and taken for its first test runs on Bron Hebog with the formation recreating the train when it was first towed from Minffordd to Blaenau Ffestiniog to try and kick start the restoration.

 
After a false start that ended up with the locomotive on display at the NRM in York where it remains.
 
The Double Fairlie story continued with Himself trying to keep pace with Boston Lodge on progress with James Spooner.
 
 
We're doing out best to adapt a Backwoods brass kit - although there will have to be the inevitable compromise on scale. 

On my workbench I was getting to grips with a new project in resin....
 

August 

Those Hula Hoop shapes were turned into the body of Maenofferen water tank wagon which sits on an extended 3 ton slate waggon chassis.

 
Almost immediate I was inundated with requests to produce a kit version....
 
And Himself used the first lockdown to reach the finishing line on another long term project, finally completing the painting and lining of our Backwoods Lyn.
 
 
The latest of our WHR saloons rolled off the production line, too.
 
 
September
 
Trying our best, once again, to stay synchronised with real world developments, Himself began painting our 130, starting with the bunkers and tanks which received their lovely crimson/plum colour and straw lining. 
 
 
After completing work on the tank waggon I was engaged on a request to produce a kit for the FR's small ex-MOD bogie wagons.
 
The first task was to find a way to produce the bogies.
 
The solution I hit on was to cast a piece which could slip over the very free-running Hudson bogie sold by Dundas.    
 
 
In fact, Dundas was doing very good business out of us with Himself deciding it was time to replace a lot of our slate waggon fleet as the 30 year old bodies became brittle.
 
This time instead of a uniform grey he decided to make them a little more colourful.
 

Tuesday, 22 December 2020

2020 Review

I expect you're probably already heartily sick of reading posts about how **** a year it's been - but don't click away, because this is not one of them!

One of the few Christmas traditions that isn't being altered this year is that I like to take a look back at all that we've achieved in the last 12 months on our respective workbenches.

I always find I'm surprised by how much we've got done and the things I'd forgotten about.

January


At the start of the year I was working on the latest WHR Pullman observation carriage Gwyrfai which I was scratch building mostly from styrene except for the curved front and roof which were to be bent from brass.

Himself was having an adventure in 3mm standard gauge building a very complex chassis for a GWR 2-8-0 tank for the Engineering Consultant.


February

A few weeks later and the body was at an advanced stage with a very crisply cast boiler and that classic huge bunker at the back.


And by this time Himself had also bent and soldered up the front for the Obs which was being offered up to test.


The idea was that once we were happy with the shape I could apply a thin plastic skin and beading to make it match the styrene body sides.

March

We'd been closely following progress on the rebuild of 130 at Dinas, and as reports were published on the web Himself would add more bits to our Backwoods kit build which had been started the year before.


In this picture of the boiler bands have just been fitted.

This was the point in the year when we entered the first lockdown, and Himself starting looking around for other projects to keep him busy and hit on the idea of doing something with an ancient white metal England engine body and a knackered Ibertren chassis from the bits boxes.


In the next post I'll show you what he ended up doing with it....