Showing posts with label 39. Show all posts
Showing posts with label 39. Show all posts

Monday, 27 December 2021

Review Of The Year - Part 2

Picking up on our look back at the year, and a lot of what we were up to in the spring revolved around the carriage fleet.
 
April

A long-term ambition had been to get round to buying and assembling a Chris Veitch brass kit for the FR 'sentry' brake van, which makes a very distinctive model full of Victorian character.


Trying our best to keep up with the carriage works in Wales we also set making a miniature version of the Welsh Highland Heritage Railway's new Pickering brake replica.


This project had a false start because, at first, I purchased the Dundas brass kit.

Once Himself put the body together he found there were a few inaccuracies in the dimensions, but more importantly from our point of view, the design made it difficult to paint and to fit an interior.

So we put that one on ice and got hold of the alternative body kit from Worsley Works.

If you read the first part of the Review you'll have seen a picture of the early stages of my commission to scratch build a model of Carnforth buffet car 114.

This was a snap I took just before it was sent off to its new home.


May

A crucial part of the Pickering project was to find a way to depict the fake lamp pots on the roof.

I had a number of goes at scratch building one which could be copied with resin casting.


Himself got round to finishing off the paint job on the 3mm scale ex-GWR 2-8-0 tank engines he'd been building for the Engineering Consultant.


It was just as well we kept in his good books, unknown to anyone, he was about to become a very important person in the top left hand corner of Wales.

In this month I also resolved that the time had come to make a model of the WHR's diesel shunter at Dinas.


The post about my intentions resulted in an offer to try out one of the prototype body kits from RT Models....

June

The paint job on the Pickering brake was one of the more straightforward ones so we didn't have long to wait for a picture of it posed ready for service on Bron Hebog.


With the Pickering built it left the Hudson toast rack carriage as one of the obvious missing vehicles from our WHHR sets.

We managed to get hold of one of the 009 Society kits before they sold out, but I was also keen to have a second model of the FR replica 39 in its current green livery, so the only option left was to scratch build.


This was a fortunate move because it transpired that Winson Engineering wasn't capable of making an exact copy of the original carriage, and there are some fundamental differences between the 1990s version and the original carriages.

My plan was to make a master for the carriage sides in styrene and cast a copy of it - the one in the picture shows me starting to embellish it with extra details in brass and styrene.

And June was also the month when, after much planning, we began installing the baseboard for a permanent dual gauge test track, my first home layout since I was a teenager.


We came up with an 8ft x 5ft board which can be folded into a frame on the wall when the space in the study is required for something more boring, such as *spoiler alert* self-isolating from Covid-19.....







Monday, 22 November 2021

Replicas Running

Now the varnish has set, and the bogies been fixed on,  Himself has sent me a couple of pictures of our new replicas - Ashbury 21 and Hudson toast rack 39 - on a test run on the layout.



21 is from a Worsley brass body kit and 39 was scratch built with most of the body cast in resin by myself,

This gives us a very respectable length of a 'Garraway' vintage set strengthens our 'Col Stephens' options as well, although we are a few green bug boxes short in that department.


They look very good posed in the platform at Beddgelert station on Bron Hebog.

It shouldn't be too much longer before our Bachmann Double Fairlies arrive and I'm really looking forward to seeing what the green Earl of Merioneth looks like hauling some of our green and ivory and all-over red stock.

Totally out of period for us, of course, but it's nearly Christmas so we're allowed, aren't we?

Wednesday, 17 November 2021

Open For Business

I've got more action to report from the paint shop.

Himself has been busy with the multi-coloured Hudson semi-open carriages - one the replica for the FR and the other for the WHHR fleet, which have different origins.


The red (WHHR) one is from the very neat 009 Society injection moulded kit, and has had a few enhancements such as brake pipes and the safety chains across the passenger access openings.

The green (FR) version is one I cast in resin from a scratch built master I made in styrene, and has a number of differences, including the positions of the right angle uprights and the number of slats on the end panels.

The mesh doors - a mid-life upgrade which offer significantly more protection than the chains on number 42 - are 3D prints which were kindly donated to the project.

For a few minutes Himself thought he had caught me out by noticing that number 39 currently has fewer, and thicker, planks on the ends, but he forgot the golden rule of FR modelling, which is that things change so frequently you have to choose the day you are modelling your locomotive, carriage or waggon and stick to it.

Thus, this 39 shows the carriage before its most recently, and thorough, overhaul.

Wednesday, 18 August 2021

Two Slices

I've been getting very behind in my blogging again.

It's not that there's no modelling going on, but the lack of updates here is because I have been lured back to the dark side of standard gauge and have spent much of my spare time in the last couple of weeks working on the tracklaying on the dual gauge 'test track' in the study.

Officially, this is a more practical solution for my son's OO 'train set'.........

I have stayed away from posting updates about that here because you come to read about narrow gauge modelling, right?

I did manage to get some FR work done immediately after my return from a few days in Wales  - the first time at the railway since 2019.

With the arrival in the post of a pack of fresh Hudson bogies I have trial-fitted the chassis in the toast rack carriage 39.

The task which am putting off - and which the OO track is providing an ideal excuse for - is trying to find a way to represent the tiny mesh safety doors fitted to this carriage.

All suggestions welcome...



Wednesday, 4 August 2021

Toast Rack Update

I apologise for things being a little quiet on the blog in recent weeks, which is on account of a number of factors including holidays, effort on constructing the dual gauge home 'test track', and a secret project that I can't tell you about.

All of which means that there hasn't been much progress with my scratch built model of FR Hudson 'toast rack' replica 39 until the other day when I cut out and test fitted a styrene floor / chassis for the body which has been glued together.

At the moment I only have the one pair of bogies - which I've stolen off the 009 Society kit - so I can't glue the floor into place and finalise its position and the running height until they are both on the rails and I can accurately compare them.

I have a pair on order but it's likely to be more than a week until I receive them.

Wednesday, 23 June 2021

Hooping For The Best

For what appears to be such a basic and insubstantial carriage it's remarkable how much fiddly work is involved in scratch building a model of FR 'toast rack' carr 39.

Last night's task was to begin bending and fitting the distinctive hoops at the side of these Hudson carriages.

This involves forming sets of U shapes of three radii out of 0.45 brass wire and carefully fixing them in position.

Thank goodness for 60 second superglue!

One down, one to go.


Thursday, 10 June 2021

Non-Identical Twins

I suppose in a way my naivety is quite touching, but I really shouldn't have been surprised when my plan to make one master for the sides of the FR and WHHR Hudson toast rack carriages hit a snag.

A correspondent informed me that there is a clear difference in the pair in the orientation of the upright L girders on the sides.

While the WHHR rebuild has them as per the original carriages the FR replica - built by Winson Engineering in the 1990s - has most of them facing in the opposite direction.

I am also informed that this is not what was designed, however, that is what was delivered!

Armed with this unfortunate information my options were:

a) build separate masters for the two carriages

or

b) try to slice off the uprights to make a generic master to which I could use to cast incomplete sides and add the uprights separately for each carriage.

I've decided to go for the second option.


This now looks a lot more basic, although I have been able to add on the footboard and some resin rivet head transfers along the frame.

Hopefully cutting and sticking on the girders will be much less hassle than having to make a whole second side from scratch.


Sunday, 6 June 2021

Hot Toast

It's been an ambition for a while to get a second model of Hudson 'toast rack' carriage 39 in the fleet, wearing its Col. Stephens green to match many of the other vintage carriages.

Our existing model is one I scratch built in styrene probably the best part of 25 years ago in its original red and ivory colour scheme.

As well as the FR one we could do with a third model to represent carriage 42 on the Welsh Highland Heritage Railway.

So when I heard the 009 Society had produced a run of their exclusive, members-only, kits for the first time in many years I thought that would be the ideal opportunity to get these models built.

Alas, it appears they have sold like hot cakes - or more like hot toast? - and by the time Himself obtained a login for the members' section of the shop they'd all gone!

So rather than wait for an announcement about if or when there might be another production run, I've decided the best thing to do is to make a pair myself.

I've done it before so it won't be difficult.

I'm going to make up masters for the sides and ends and cast copies in resin.

A friend, who got in ahead of us and bought a handful of the Society kits, kindly helped me out with a few measurements and after a couple of hours work last night I've got this far.

Just like the Society kit the semi-circle hoops which are such a feature of these carriages will be added on by hand, and I've still got the footboard and the triangular underframe to add - plus bolt heads / rivets - before it is ready to make a mould from.

The ends will be slightly more involved as the FR and WHHR examples are different - or at least they were in the period I'm going to model them - 39 had many more horizontal slats before it was taken in for a heavy overhaul ahead of the 2021 season.




Friday, 17 May 2019

Hudson Healthcheck

Himself has been doing some last minute maintenance on the stock ahead of the exhibition in Troon which starts tomorrow (Saturday).

We’re still going through the process of converting all the couplings from Bemo to Greenwich ones, and the latest to be done is the replica Hudson ‘toast rack’ 39.


This was a model I scratch built one summer holiday when I was a student, so we’re talking mid-90s here, and I used one of the Dundas kits for 37/38 as a guide and source of bogies.

Eventually I think we might replace our semi-opens with new models in their current liveries.

Since I made my 39 the 009 Society produced a limited edition plastic kit for it.

If anyone knows of an unbuilt example that is potentially for sale i’d Be very keen to hear more about it.