June
The paint job on the Pickering brake was one of the more straightforward ones so we didn't have long to wait for a picture of it posed ready for service on Bron Hebog.
June
The paint job on the Pickering brake was one of the more straightforward ones so we didn't have long to wait for a picture of it posed ready for service on Bron Hebog.
I've been getting very behind in my blogging again.
It's not that there's no modelling going on, but the lack of updates here is because I have been lured back to the dark side of standard gauge and have spent much of my spare time in the last couple of weeks working on the tracklaying on the dual gauge 'test track' in the study.
Officially, this is a more practical solution for my son's OO 'train set'.........
I have stayed away from posting updates about that here because you come to read about narrow gauge modelling, right?
I did manage to get some FR work done immediately after my return from a few days in Wales - the first time at the railway since 2019.
With the arrival in the post of a pack of fresh Hudson bogies I have trial-fitted the chassis in the toast rack carriage 39.
The task which am putting off - and which the OO track is providing an ideal excuse for - is trying to find a way to represent the tiny mesh safety doors fitted to this carriage.
All suggestions welcome...
I apologise for things being a little quiet on the blog in recent weeks, which is on account of a number of factors including holidays, effort on constructing the dual gauge home 'test track', and a secret project that I can't tell you about.
All of which means that there hasn't been much progress with my scratch built model of FR Hudson 'toast rack' replica 39 until the other day when I cut out and test fitted a styrene floor / chassis for the body which has been glued together.
At the moment I only have the one pair of bogies - which I've stolen off the 009 Society kit - so I can't glue the floor into place and finalise its position and the running height until they are both on the rails and I can accurately compare them.
I have a pair on order but it's likely to be more than a week until I receive them.
For what appears to be such a basic and insubstantial carriage it's remarkable how much fiddly work is involved in scratch building a model of FR 'toast rack' carr 39.
Last night's task was to begin bending and fitting the distinctive hoops at the side of these Hudson carriages.
This involves forming sets of U shapes of three radii out of 0.45 brass wire and carefully fixing them in position.
Thank goodness for 60 second superglue!
One down, one to go.
I suppose in a way my naivety is quite touching, but I really shouldn't have been surprised when my plan to make one master for the sides of the FR and WHHR Hudson toast rack carriages hit a snag.
A correspondent informed me that there is a clear difference in the pair in the orientation of the upright L girders on the sides.
While the WHHR rebuild has them as per the original carriages the FR replica - built by Winson Engineering in the 1990s - has most of them facing in the opposite direction.
I am also informed that this is not what was designed, however, that is what was delivered!
Armed with this unfortunate information my options were:
a) build separate masters for the two carriages
or
b) try to slice off the uprights to make a generic master to which I could use to cast incomplete sides and add the uprights separately for each carriage.
I've decided to go for the second option.
It's been an ambition for a while to get a second model of Hudson 'toast rack' carriage 39 in the fleet, wearing its Col. Stephens green to match many of the other vintage carriages.
Our existing model is one I scratch built in styrene probably the best part of 25 years ago in its original red and ivory colour scheme.
As well as the FR one we could do with a third model to represent carriage 42 on the Welsh Highland Heritage Railway.
So when I heard the 009 Society had produced a run of their exclusive, members-only, kits for the first time in many years I thought that would be the ideal opportunity to get these models built.
Alas, it appears they have sold like hot cakes - or more like hot toast? - and by the time Himself obtained a login for the members' section of the shop they'd all gone!
So rather than wait for an announcement about if or when there might be another production run, I've decided the best thing to do is to make a pair myself.
I've done it before so it won't be difficult.
I'm going to make up masters for the sides and ends and cast copies in resin.
A friend, who got in ahead of us and bought a handful of the Society kits, kindly helped me out with a few measurements and after a couple of hours work last night I've got this far.
Just like the Society kit the semi-circle hoops which are such a feature of these carriages will be added on by hand, and I've still got the footboard and the triangular underframe to add - plus bolt heads / rivets - before it is ready to make a mould from.
The ends will be slightly more involved as the FR and WHHR examples are different - or at least they were in the period I'm going to model them - 39 had many more horizontal slats before it was taken in for a heavy overhaul ahead of the 2021 season.