Sunday 13 December 2020

Eight Track

I'm ready to put the Funkey bogie frames into production.

The master was completed with the aid of styrene strip and a butchered 10BA bolt to represent the springs.

That was made into a mould and copied four times to produce a second master to enable me to make a full set for a locomotive in one casting.

That will save a lot of effort given the number of enquiries I've had about these in the last few days.

No comments:

Post a Comment