Sunday, 30 December 2018

Review Of The Year - Part 4

October

So to the final post of the year.

Dduallt was making yet another comeback, appearing at our home club's exhibition over two days in Greenock, and there will be more outings in 2019.


Himself hadn't wasted any time in getting started on the first of the new Garratt kits, which we decided would be 143.

He was making very rapid progress on the power units - here's the front one.


We were also taking apart our eldest Backwoods Fairlie, Merddin Emrys, to try and get to the bottom of its very poor performance.


It turned out that what it needed was new brushes for its Mashima motor.

Fortunately these could be fitted by twisting the motor round in the mounting, because it's impossible to remove it without deconstructing a lot of the locomotive.

November

I was making more progress on superbarn 120 which was having its underframe detail added by this stage.


Himself was adding the valve gear to the first of the Garratt bogies, which was being test run.


I had taken on the job of making up some wagon kits as repeat business for a customer.


December

Progress on 143 had got the point where both power units had their vale gear fitted and much of the detail was in place on the boiler unit as well.

As I write it has yet to be joined together or pick-ups fitted, so there's be no test running so far.


The ballast wagons and B wagons were completed and delivered to the customer ready in time for Christmas, even though there was no deadline on the contract.


Thanks to you for reading the blog in 2018 and all our best wishes for 2019.

Friday, 28 December 2018

Review Of The Year - Part 3

July

And so to the second half of 2018 where there was much excitement at the arrival of our first ready-to-run model, the Bachmann 590 Baldwin.


I've never made any secret of my enthusiasm for the mainstream manufacturers discovering 009.

The intensity of the debate online around this has been second only to Brexit, but unlike the latter subject I can see only positives in this development for our scale.

I'm hugely excited about the next project in the pipeline, the small quarry Hunslets (especially the cab-less versions) and for what this innovative firm might decide to do next.

In this month I began work on a project which had been on the back burner for a while, to make models of the hybrid BZ wagons made at Boston Lodge for infrastructure trains on the FR.


I decided to make masters and cast them in resin, even though only two have been produced so far and they are far from identical.

July was also the month where, quite by chance, I discovered that the last two Backwoods NGG16 kits produced were available to buy.


We had to dig deep to avert the possibility of them being offered for sale in an online auction, but we'd been looking for a number of years for the opportunity to complete our Garratt fleet and it was too good an opportunity to miss.

August

The first of the BZ wagons had been cast and was being put together.


The fold-flat end doors are a right pain because I had to scratch build the triangular support brackets in styrene, which was a very fiddly job.

Himself had been putting together a Chivers kit of a tiny Hunslet diesel to replace our model of Harold, the Boston Lodge shunter, which had been stolen when we were exhibiting Dduallt in Leeds a number of years ago.


And to have a bit of fun for when we took Bron Hebog to show at the Welsh Highland 'Super Power' weekend I decided to add a very contemporary scenic feature - a reminder of the day when a driver tried his luck racing a Garratt to Bron Hebog crossing - and the Garratt won!


September

Himself had taken an executive decision to invest in panoramic photographic backscenes for the show at Dinas.

The result was very effective indeed!


We had a fabulous time - as we always do - showing Bron Hebog in the goods shed, this time in its finished state.

The Lynton and Barnstaple Baldwin Lyn was the star attraction on the railway and Himself pulled out the stops to get the Backwoods kit we had been given running.


Once again we couldn't resist being cheeky and double-heading it with Lyd knowing that the real locomotives were not being allowed anywhere near each other that weekend.

Back home the production line of superbarns continued with a start being made on assembling number 120.

Monday, 24 December 2018

Season's Greetings

Saturday, 22 December 2018

Review Of The Year - Part 2

April

By this point my Bro Madog kit-bash had got to the point where the body had been assembled and was ready to be primed.


The main change to the carriage was creating the toplight windows by cutting out solid plastic and inserting new pillars and a top rail.

I was pleased that you really couldn't see the join.

Himself was tackling the biggest outstanding scenery job which was lining the walls of Cutting Mawr.


Some of it was done with genuine pieces of Welsh rock, although most were copies I'd cast in resin.

He also set about fitting a basic backscene to hide the goings-on in the fiddle yards from view.


May

I had started work on a second WHHR vehicle for a new rake, and again it involved a kit bash.

The ex-VoR brake van has changed a lot from the version with matchboard sides which is made by Dundas.

What I decided on was using the chassis and the very bottom section of the body (showing the frames) and making the rest out of styrene.

It was coming along well.


Himself had done a quite remarkable job with the gold leaf lining on a second vintage carriage - this time number 15.


And I was busy starting work on yet along superbarn, this time casting the parts for what would become 120.


June

This was a very big month for us as we took Bron Hebog out on the road for the first time in a couple of years - and what a road trip it was, all the way to Norfolk for a one day show!


The Dad's Army section of the museum building is certainly up there as one of the more unusual venues we've exhibited at, but they looked after us very well indeed all weekend.

It'd got the WHHR brake van ready to the point where it had been painted in BR blue, just like the real one, to wind everyone up.


Unfortunately I had yet to get my hands on some of the famous double arrow transfers to complete the look.

We'd had a few issues with track alignments during the show. It was nothing major but it's still and irritation when you're exhibiting, so Himself decided to invest in some additional  measures after we'd returned home.


These precision engineering dowels don't come cheap, but hopefully it will be money well spent.

Thursday, 20 December 2018

Review Of The Year - Part 1

I've established a tradition on this blog in the last days of December of taking stock of everything that Himself and I have achieved over the year.

I usually find there are things that I've forgotten about, and I'm always surprised by how much we've got done.

So here's a look back at what we were up to in the first quarter of 2018.

January

Looking back now I see that there was a lot of carriage building going on at this time.

FR 'superbarn' 118, which I'd built up from resin castings, had been painted, assembled, had its transfers applied and, finally, varnished.


Himself was also starting work on a very long-term project indeed - the completion of a Worsley Works bowsider 19 which had been sitting in a drawer in its naked state for years.


I was also busy trying to keep up with the expanding WHR carriage fleet and had started work on saloon 2047 which was being scratch built in styrene - as opposed to the resin parts I use for the latest FR stock.


February

This was the big reveal of our finished Robex 3D printed Lilla.


I thought at the time - and still do - that it looks absolutely stunning!

We'd decided to finish it in its current, highly ornate, plum livery with oodles of gold leaf lining.

It was taking up all Himself's reserves of patience and concentration but it was already clear the results were going to be worth it.



He'd also restarted work to plug the last remining scenic gap on the layout, landscaping around the last two houses I'd built.


March

There was yet more carriage work going on with me kit-bashing a Dundas 'Bro Madog' carriage to make it look like it's current condition on the WHHR.

As to why I was doing it, that was about to be revealed...


I'd also been putting together the castings for the second of the latest FR observation carrs 152 ready for Himself to add a brass roof and the window pillars at the front.


The reason I was making a WHHR carriage became clear when I handed over Himself's birthday present - a Robex print for the Bagnall Gelert.


I had confidence that he'd make a fine job of the body, after what he'd done with Lilla

The challenge for him was going to be doing the outside frame adaptation on a Fleischman chassis to go under it.

I had a feeling he wasn't going to thank me for that...


Tuesday, 18 December 2018

We Shall Need Gladstone

Don't worry, we're not about to go standard gauge on you.

It's just that the line from the Will Hay classic "Oh Mr Porter!" came to mind when I was pondering which project to take on now I've got that contract job on the SAR wagons out of the way.


Given the recent political breakthrough between the FR and the WHHR (which, let the record show, we anticipated in miniature by three full months!) we're going to need a more authentic train for our Russell to haul on Bron Hebog.

This summer I finished the ex-VoR brake van in BR blue, and the Bro Madog carriage, and I think what I might work on next is a 'Gladstone Carriage' - so-called because the lengendary Liberal Prime Minister is reputed to have ridden in it once.

I have built one before, in styrene, for a customer.


The question is whether I scratch build again this time for myself or invest in a brass body for it?


Sunday, 16 December 2018

Ready For Christmas

With just the small matter of the bogie frames to clean up and fit it didn't take long to finish off the wagons I've been making for a client.


Time now to package them up and despatch them by reindeer and sleigh in time for Christmas.