Monday, 30 January 2012

Tables & Chairs

I seized upon the chance of an afternoon of domestic solitude to complete the interior of the 7mm Pullman carriage 'Bodysgallen'.

The tables, armchairs and the internal dividers are in position.



This shot shows how the interior is built up on the chassis / underframe.



There's not a lot more to do on this carriage before it's ready to be painted. The outstanding jobs are the handrails on either side of the doors to be folded up from brass wire and on each end I need to make and mount vacuum pipes and electrical connections.

I also need to mount the Kadee couplings and set the heights correctly - when I finally get my hands on some.

3 comments:

  1. This is exquisite, amazing to watch it all come together--learning a lot for the ride.

    P

    ReplyDelete