Operation Observation Undercoat

If building 150 from scratch was a daunting prospect then so must painting it - more accurately lining it out afterwards.

So I'm impressed that Himself has grasped the nettle and started the process by giving it a coat of primer.


Before this there were a few little jobs to finish off like fitting the gutter down pipes at the back and the train vacuum pipe along the length of the underframe.

The vac pipe on the very front won't be fixed into position until the painting and lining is complete.