Sunday, 26 May 2013

Dorm Patrol

I've been able to get the final section of roof finished following the arrival of a fresh packet of Wills roofing slates.

This is the big piece at the rear which has to be cut into and offset shape and also requires a square section to be cut out where the dormer goes.


Here it is with the dormer glued in place and the chimney in position too.


That brings this second house to the same state as the first one.


And here's a shot of the two of them together orientated as they will be when in position on the layout above the entrance to Goat Cutting.




No comments:

Post a Comment