Part of the reason for the long delay - aside from a general lack of motivation ever since the Glasgow show - is I had run out of the 60 second superglue I've taken to using for assembling resin parts.
It has the benefit of allowing a decent amount of repositioning while not leaving you waiting for ages for the parts to bond, which I've found has always been the case with the so-called 'rapid' epoxy resins.
However, in one of the small DIY shops in town - and we are fortunate to have two here - I came across a 90 second Araldite product which comes in a double syringe dispenser thing.
I was sceptical whether it would actually bond in 90 seconds - it's more like 490 in my experience - but the join does seem to be less brittle than one made with superglue is.
We shall see how it stands up to all the handling as I fit the floor and roof.
So happy to see posts here again. I feel that for whatever reason the reaction you got in Glasgow was quite simply wrong. In my opinion Bron Hebog and all the stock that runs on it is nothing short of amazing and this blog itself is a valuable FR/WHR resource.
ReplyDelete