Sunday, 24 May 2015

Ready For Relaying

Down south work continues on the Fiddle Yard refurb.


Himself has replaced the fascia and restored the uniform mud colour.

In these snaps you can see how there is now a clear split level along the middle section of the yard which will give us much longer storage roads.

He is waiting for more points to arrive to enable him to relay the trackwork


In the meantime he has produced a mock up of where the yard control panels will be positioned.

At the first two exhibitions we made do with a temporary double controller in the centre of the yard which combined with hand operated points wore out a lot of shoe leather over the course of a weekend.

Layout operating is so much more civilised when one can sit down on the job, don't you agree?

No comments:

Post a Comment