We've been back just over a week but already the bulk of the destructive alterations to the layout we decided were needed after our research visits are in hand.

The 'extra' scenery between the FR mainline and the bottom of the exchange yard, has been hacked away to make room for both of the Maenofferen sheds.

The point work at the end of the upper run-round loop has been lifted so the turnouts can be repositioned to allow a connection to the siding which squeezes between the large and small shed.

At the other end, the original square bridge beams have been hacked out and I spend the weekend designing and casting some replacements to the correct bow-string profile and it looks like they're going to fit very sweetly in the gap.


It just goes to show what you can achieve quickly when you're sufficiently motivated.