Friday, 13 March 2020

Over The Top

The roof has been the focus of work on Gwyrfai this week.


In the photo you can see the structure I use with the flat false ceiling, longitudinal ribs and the styrene skin over the top and glued only at each edge.

I’ve also made some shapers to help form the sloped end at the front.

The voids will be filled with Milliput, which although it takes longer to set provides a much smoother and more solid structure than filler ever could.

No comments:

Post a Comment