Himself is slightly short on projects so has been flirting with a danger and second-guessing Boston Lodge.
More specifically, he's been jumping a few steps ahead of the FR with the construction of James Spooner (II).
Don't worry!
None of it is glued down - or soldered down, to be technically correct.
This mock up with the tanks and the half cab is only held in place with Blu Tack and fresh air - and the cab roof which has been sliced up is just a spare etch we had in a drawer.
I gather his main concern at the moment is finding the best way to remove the etched ribs.
No comments:
Post a Comment